
Kelly Construction (Antigua) Ltd has been contracted by PLH (Barbuda) Ltd to provide early earthworks at its Palmetto Point and Coco Point locations.

Kelly Construction (Antigua) Ltd has been contracted by PLH (Barbuda) Ltd to provide early earthworks at its Palmetto Point and Coco Point locations.

With increased health and safety standards amid the COVID-19 pandemic, Kelly Construction has continued work on Phase 2 of the Eastern Caribbean Central Bank (ECCB) Solar Project. Increased safety measures include hand washing and sanitizing upon entry to the work site, routine sanitizing of equipment and shared areas throughout the day, mandatory use of face masks and work gloves along with daily COVID-19 health reminders during the daily toolbox talks.

Kelly Construction has added three (3) additional Terex TA300 Articulating Dumpers, two (2) Doosan DX350 Exacavators, one (1) Caterpillar D6K Dozer and one (1) Terex Site Dumper. The new additions are located in Antigua to better serve the Kelly Construction Antigua sister company.