
Blog
Kelly Construction Co. Inc. completes another successful project with the safe delivery of the pre-cast beams for the Second Cruise Ship Pier at Port Zante

Kelly Construction Co. Inc. completes another successful project with the safe delivery of the pre-cast beams for the Second Cruise Ship Pier at Port Zante

Our CAT 330DL equipped with its 54′ long reach arm was deployed to dredge sand for the beach rehabilitation project at Bird Rock Beach, St.

Kelly Construction adds a Kobelco CK850III Crane to its expanding fleet of equipment. The CK850III has a maximum lifting capacity of 85 tons and maximum