
Blog
Our CAT 330DL equipped with its 54′ long reach arm was deployed to dredge sand for the beach rehabilitation project at Bird Rock Beach, St.

Our CAT 330DL equipped with its 54′ long reach arm was deployed to dredge sand for the beach rehabilitation project at Bird Rock Beach, St.

Works On Revetment Underway at Port Zante [youtube height=”315″ width=”560″]PLACE_LINK_HERE[/youtube] [column col=”1/2″] Kelly Construction has begun the removal of boulders at the revetment at Port

Frigate Bay, St. Kitts, May 15th, 2018 [column col=”1/2″] [youtube height=”315″ width=”560″]PLACE_LINK_HERE[/youtube] Click on the video above to see the progress of the work at Lot